Construction Stages
Stage 1
Scaffolding is erected to provide independent access to the loft.


Stage 2
Structural beams are installed into party walls to form independent timber floor support and front roof elevation with dwarf wall.


Stage 3
Create Dormer structure and install Velux windows.


Stage 4
Complete roof tiling to both new dormer and front roof elevation.


Stage 5
Build interior partician, doorways and ceilings.


Stage 6
Install double glazed windows. At this stage, insulation of the floor and walls is undertaken.


Stage 7
Create new access staircase between loft conversion and first floor.


Stage 8
Then plasterboard throughout and finally finish with a plaster skim.